In addition to the above mentioned work, the relocation of Dr. Robert Lodder's A.S.R.G. chemistry and pharmacy labs to the new Advanced Science and Technology Center (ASTECC) remained a top priority. At this point, the pharmacy lab has been completely moved into the ASTECC facility while the move of the chemistry lab is nearing completion. Once the chemistry lab has been completely moved, the new ASTECC lab will need to be cleaned up and organized. Furthermore, the laboratory equipment will also need to be setup up and made operational. Currently, in order to make the optical table operational, air tubing and connectors are being ordered to fit the table to a standard air compressor. Once this is complete, the Nd:YAG pump laser and OPO tuneable laser will be cleaned and reassembled on the optical table.